Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
- 10. Brake system
   + 10.1.2. Shock-absorbers
   + 10.2. Technical characteristics
   10.3. Prorolling of hydraulic system
   10.4. Hydraulic tubes and hoses
   10.5. Brake overlays of forward brakes
   10.6. Brake overlays of back wheels
   10.7. Brake колодки back brakes
   10.8. A brake disk of a forward wheel
   10.9. A brake disk of a back wheel
   10.10. A brake drum of a back brake
   10.11. A support of a forward brake
   10.12. A support of a back brake
   10.13. The wheel cylinder of a back brake
   10.14. The main brake cylinder
   10.15. A brake pedal
   10.16. The vaakuumnyj amplifier
   10.17. The vacuum valve of a servoamplifier
   10.18. A rope of a manual brake
   10.19. The lever of a manual brake
   10.20. The valve of adjustment of pressure in a contour of back brakes (till 96 of century)
   10.21. The switch of fires of a stoplight
   10.22. The general description of system of antiblocking of brakes (ABS)
   10.23. System ABS elements
   10.24. The vacuum pump (diesel and petrol engines in volume 2,3)
+ 11. Suspension brackets, a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice


10.5. Brake overlays of forward brakes
THE GENERAL DATA

The prevention

Always replace brake overlays on both wheels simultaneously.


Replacement

PERFORMANCE ORDER
1. Lift the car and establish it on support. Remove forward wheels.
2. Disconnect a socket of connection of the gauge of deterioration and remove it from fastening.
3. Remove a fixing spring of overlays.
4. Remove caps from support fingers.
5. Remove fingers and remove a support.
6. Remove overlays.

7. Measure a thickness of a frictional material and replace overlays if it is necessary.

8. Installation is spent upside-down removals. Check up correctness of installation of a support and insert fingers.